国际工程索赔和典型案例分析

如何索赔? 
索赔要素矩阵 - 软实力
从开始到结束 - 合同索赔操作
从开始到结束 - 正确发出索赔通知的要求
工程师
参考通讯条款
索赔的事件或情况
知道或应知后28天
属于TIME BAR条款
“组合式”索赔通知举例Multi-notification of Claim
有关索赔程序条款的风险与谈判要点
If the Contractor encounters adverse physical 
conditions which he considers to have been 
Unforeseeable, the Contractor shall give notice 
to the Engineer as soon as practicable.      
如果承包商认为遇到不可预见不利物质条件,应尽快通知工程师。     
This notice shall describe the physical conditions, 
so that they can be inspected by the Engineer, and 
shall set out the reasons why the Contractor 
considers them to be Unforeseeable.      
此通知应当:(i)描述物质条件以便工程师进行检验,并(ii)提出承包商认为不可预见的理由(请注意:该份通知应同时满足上述两个条件的要求)。
FIDIC CONS/P&DB 
4.12不可预见物质条件
“If and to the extent that the Contractor 
encounters physical conditions which are 
Unforeseeable, gives such a notice, and 
suffers delay and/or incurs Cost due 
to these conditions, the Contractor shall 
be entitled subject to Sub-Clause 20.1 … to:      
“如果承包商遇到不可预见的物质条件,并发出此项通知,因这些条件达到遭受延误和(或)增加费用的程度,承包商应有权根据第20.1款…要求:         