survey report 34056-PRE-2009A
survey report 34056-PRE-2009B
INDEX
1. GENERAL ...............3
2. SUMMARY..............4
3. RECOMMENDATIONS........7
3.1. COMPLETED RISK IMPROVEMENT PROPOSALS ...............7
3.2. RECOMMENDATIONS MAINTAINED OR NEWLY ISSUED...8
3.2.1. CRITICAL RECOMMENDATIONS 8
3.2.2. OTHER RECOMMENDATIONS....8
4. MODIFICATIONS..13
4.1. Implemented ...........13
4.2. Future Extensions / Investment .................13
5. LOSS ESTIMATION...........14
5.1. Property .....14
5.2. Business Interruption ....15
5.3. Machinery Breakdown ..16
6. APPENDICES .......17
6.1. GRADING INFORMATION........................17
6.2. SITE PLAN 18
6.3. PHOTOS....19
6.4. TECHNICAL INFORMATION ....................20
6.5. RISK IMPROVEMENT PROPOSAL RESPONSE FORM ......22
The information contained herein is not meant to imply that every possible hazard
has been identified, or that no other
hazards exist. The Allianz Group Network specifically disclaims any warranty or
representation that compliance with
any advice contained herein will make any premises or operations safe or comply
with any health standards, law, rule
or regulation. Nothing contained herein shall be construed as indicating the
existence or availability of coverage under
any policy for any property or type of loss or damage. Any interpretation of data
contained herein should be made by
Allianz Group Network staff. Life safety considerations are not included in this
report.
Rev 2.
Account Name:
Plant Name:
RI Number:
Date of Survey:
Page: 3 / 22
survey report 34056-PRE-2009A
1. GENERAL
Participants
survey report 34056-PRE-2009B
INDEX
1. GENERAL ...............3
2. SUMMARY..............4
3. RECOMMENDATIONS........7
3.1. COMPLETED RISK IMPROVEMENT PROPOSALS ...............7
3.2. RECOMMENDATIONS MAINTAINED OR NEWLY ISSUED...8
3.2.1. CRITICAL RECOMMENDATIONS 8
3.2.2. OTHER RECOMMENDATIONS....8
4. MODIFICATIONS..13
4.1. Implemented ...........13
4.2. Future Extensions / Investment .................13
5. LOSS ESTIMATION...........14
5.1. Property .....14
5.2. Business Interruption ....15
5.3. Machinery Breakdown ..16
6. APPENDICES .......17
6.1. GRADING INFORMATION........................17
6.2. SITE PLAN 18
6.3. PHOTOS....19
6.4. TECHNICAL INFORMATION ....................20
6.5. RISK IMPROVEMENT PROPOSAL RESPONSE FORM ......22
The information contained herein is not meant to imply that every possible hazard
has been identified, or that no other
hazards exist. The Allianz Group Network specifically disclaims any warranty or
representation that compliance with
any advice contained herein will make any premises or operations safe or comply
with any health standards, law, rule
or regulation. Nothing contained herein shall be construed as indicating the
existence or availability of coverage under
any policy for any property or type of loss or damage. Any interpretation of data
contained herein should be made by
Allianz Group Network staff. Life safety considerations are not included in this
report.
Rev 2.
Account Name:
Plant Name:
RI Number:
Date of Survey:
Page: 3 / 22
survey report 34056-PRE-2009A
1. GENERAL
Participants